Facebook
Categories

What are the steps to install a hydraulic water well drilling rig?

When the hydraulic water well drilling rig is equipped with a ground beam, the diesel engine transmission device and the hoist are fixed on the base of the drilling rig.
Mar 24th,2022 1629 Views

What are the steps to install a hydraulic water well drilling rig?

  1. First make sure that the installation of the water well drilling rig should be carried out by a skilled operator and that there is one person in charge of the order.

 

2. Secondly, before determining the installation of the water well drilling rig, the topography, geology, hydrology, meteorology and flood level should be investigated.

 

3. According to the water well drilling rig at the horizontal site, the installation needs to install the drilling rig base, tower body, ground anchor, etc.

 

4. Flatten a solid part next to the predetermined orifice, the area should not be less than 53.3m2, the front of the wellhead may be uneven, but there should be no obstacles above 1m.

 

5. When the hydraulic water well drilling rig is equipped with a ground beam, the diesel engine transmission device and the hoist are fixed on the base of the drilling rig.

The above is the relevant little knowledge about "What are the steps to install a hydraulic water well drilling rig?", if you have any questions, you can contact our customer service staff of Shandong Yikuang Drilling Technology Co.,Ltd., we will be happy to discuss with you.

Leave a message
Name*
Email*
Contact number
Message
Please enter verification code.
Verification Code